Data on DG Installations in Massachusetts

2007 Data:

2006 Data (see comments below):

Future Reporting:

According to the 2006 Report of the DG Collaborative, in order to track installed DG in Massachusetts in the future, the distribution utilities plan to modify the QF report due every April 1 to the Massachusetts DPU. This previous report included the following:

1. name and address of the QF,
2. the fuel type,
3. prime mover,
4. estimated on-line date,
5. the amount of lost transition revenue expected as a result of the QF being installed.

The modified report is to continue the previous items and add the following:

6. ZIP Code of all new DG (QFs and non-QFs) interconnected,
7. date interconnection application received,
8. date interconnection application deemed complete, only for the Expedited and Standard process,
9. date interconnection agreement sent,
10. amount of un-collected distribution revenue expected as a result of the DG being installed.

The 2006 Report indicates that the above information will be filed electronically with DTE in a uniform way as an excel spreadsheet. (Name and address will be redacted in the public version of this filing.)

Existing Reports:

Other Information on DG Installations

 

 

If you have any questions, please contact Fran Cummings at MTC.