Data on DG Installations in Massachusetts
2008 Data:
- Reports from Utilities:
- Combined: xls data file
- Fitchurg Gas & Electric: xls data file
- National Grid: xls data file
- NSTAR: xls data file
- Western Massachusetts Electric: xls data file
- 2008 DPU Annual Report on Self-Generation (____ 2009)
2007 Data:
- Reports from Utilities (format revised for consistency in April 2008):
- Combined: pdf file | xls data file
- Fitchurg Gas & Electric: xls data file
- National Grid: xls data file
- NSTAR: xls data file
- Western Massachusetts Electric: xls data file
- Reports from Utilities March 2008 (temporary until all revised reports posted above):
- National Grid: pdf file | xls data file
- NSTAR: pdf file | xls data file
- 2007 DPU Annual Report on Self-Generation (July 2008)
2006 Data (see comments below):
- Reports from Utilities (combined): pdf file | xls data file
- Fitchurg Gas & Electric
- National Grid
- NSTAR
- Western Massachusetts Electric
- 2006 DPU Annual Report on Self-Generation (July 2007)
Background:
According to the 2006 Report of the DG Collaborative, in order to track installed DG in Massachusetts in the future, the distribution utilities plan to modify the QF report due every April 1 to the Massachusetts DPU. This previous report included the following:
1. name and address of the QF,
2. the fuel type,
3. prime mover,
4. estimated on-line date,
5. the amount of lost transition revenue expected as a result of the QF being installed.
The modified report is to continue the previous items and add the following:
6. ZIP Code of all new DG (QFs and non-QFs) interconnected,
7. date interconnection application received,
8. date interconnection application deemed complete, only for the Expedited and Standard process,
9. date interconnection agreement sent,
10. amount of un-collected distribution revenue expected as a result of the DG being installed.
The 2006 Report indicates that the above information will be filed electronically with DTE in a uniform way as an excel spreadsheet. (Name and address will be redacted in the public version of this filing.)
This approach was approved by the DTE in February 2007 (D.T.E. 02-38-D).
Existing Reports:
Other Information on DG Installations
If you have any questions, please contact Fran Cummings at MTC.